Dodge 2006 LX Charger Installationsanleitung Seite 18

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 53
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 17
12
Dodge Charger 2006-2008 System Installation Guide
Supercharger Crank Pulley
6.1L Crank Pinning
1
With a 10 mm socket, remove the
transmission access cover to access the
starter ring gear.
2
Lock up the transmission using
appropriate tool.
3
Remove the bolt from the center of the
balancer with a 21 mm socket.
4
Using a 3-jaw gear puller, remove the
factory balancer.
5
Install the ATI Performance Products
balancer per manufacturers instructions.
6
Place the drill jig onto the balancer hub,
tighten it into place using the supplied
M14-1.50 x 120mm hex head bolt and
washer.
7
Tape the supplied 1/4” HSS drill bit 1
5/8” from the tip. Using this taped drill,
drill a hole in the crankshaft and harmonic
balancer hub stopping at the tape edge of
the drill. The hole will be centered on the
OD of the crankshaft. Do not drill deeper
than .800” into the face of the crankshaft.
8
Remove the pinning tool and set aside.
Clean the chips from inside the drilled hole
and the surrounding area throroughly.
9
Install the supplied 1/4” OD x .75” long
stainless steel dowel pin in the hole.
R
EMOVING THE FACTORY BALANCER
DRILL JIG INSTALLED/DRILLING THE CRANK

7$3(
'5,//-,*
&5$1.3,11,1*),;785(
0',
0;%2/7
CRANKSHAFT AND HARMONIC BALANCER DRILL JIG
M14-1.50 x 120MM BOLT
Seitenansicht 17
1 2 ... 13 14 15 16 17 18 19 20 21 22 23 ... 52 53

Kommentare zu diesen Handbüchern

Keine Kommentare