Dodge RAM 1500 2010 Bedienungshandbuch Seite 8

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 9
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 7
8 ‘09-’10 1500 Front Leveling - Kit DL229
much greater now that the kit coil spacer is in
place.)
3. Install ABS lines back into there clips.
4. install two lower nuts into both rear sway bar end
links.
5. Install rear wheels onto vehicle with lug nuts. Snug,
but DO NOT TIGHTEN.
6. Using hydraulic floor jack, raise rear of vehicle and
remove jack stands. Slowly lower vehicle onto
ground.
7. TORQUE rear lug nuts to specification.
8.
Rear Shock
Install Rear
Shock Bolt
Brake line
Install ABS
Line
After Completing Installation
Engine Compartment
1. Connect both battery cables. Connect positive cable
first, then negative cable.
Miscellaneous
1. Apply kit label (warning) onto dashboard in plain
sight of all vehicle occupants.
2. Adjust headlights.
3. Check all fasteners to ensure they are tight.
4. Ensure all wires, hoses, cables, etc. are properly
connected and there is ample slack.
5. Align vehicle to OE specifications. Retain alignment
results.
Dynamic Vehicle Check
1. Check steering and suspension in all positions to
ensure that there is no bind and adequate clearance
between all moving, fixed, and heated members.
Check operation of clutch, brake system, and park-
ing brake. Check operation of transmission and
transfer case. Ensure there is full engagement in all
gears and 4WD ranges. Check battery connections
and electrical component operations. Test-drive
vehicle.
WARNING
Retorque all fasteners after 500 miles and after off road
use. All suspension lift components should be visually
inspected and fasteners retorqued during routine vehi-
cle servicing.
Positive
Cable
Battery
Negative
Cable
Copyright 09/09
Performance Automotive Group
www.p-a-g.net
Seitenansicht 7
1 2 3 4 5 6 7 8 9

Kommentare zu diesen Handbüchern

Keine Kommentare